Aotea – Stage 18(B)
Aotea’s Last Stage – 45 lots ranging in size from 500m2 – 1054m2
Construction is well underway with title anticipated mid 2022
Being sold by way of tender – closing 3.00 pm sharp Friday 26 February 2021
Stage 18(b) Draft Scheme Plan | Aotea Stage 18(b) Covenants | Aotea Stage 18(b) Tender Document | Aotea Stage 18(b) Draft Sale and Purchase Agreement
Stage 18(b) has 45 lots on offer – located at the very top of Aotea – most with flat to gentle build contours. These sections have views looking out to the hillside ranges beyond and are set to become the last sections available for purchase in Aotea.
As this stage is still under construction, access to the site is strictly prohibited without supervision by our inducted sales personnel.